Thursday, 27 July 2017

Baby pulling into the lead

It's the great race: Baby VS Kitchen


This was taken on Monday 24th Jul - Baby and I in the kitchen,
Chatted to builder on Wednesday and he said 3 more weeks till all is done.
That takes us to around the 17th August.
If baby hasn't come, I'll be induced on the 14th August.
So it looks like baby might win this race...
But you never know!


On another note; look above the door!
Yes, it is, it's the electric meter.
In it's new home. Hooray!

So even though it wasn't moved before the 20th of July as I hoped, all the prayers for it were invaluable because as in the previous post; the Scottish Power man was off sick and his colleague answered, the workmen were 1.5hrs late, I had to meet them because our builder was busy, I had forgotten to acquire a fuse board (they gave us one), no one knew were were supposed to have drilled a hole in the wall for them previously... I called Max the builder and he could spare no one, so then called friends from church the Irvines - and Andy had a 1 meter drill bit, and Moira was at home, so I drove by, picked it up, and the electricians who were sub contracted drilled the hole even though by rights they shouldn't have had to. Joanna and I were going to go and let them in at 11am and have a coffee.... We ended up hanging about and eventually got our lunch(!) by 2.30pm. It was a saga, but the meter is moved and temporary electricity set up to continue the work. Apparently today they are doing all the wall plasterwork.

On the building warrant front, our building officer asked for hard copies of all the paperwork which we sent in last week. I called him this morning and he has them and said he would look over them. Our builder has worked with the officer before and says he is a bit grumpy, and looks into all the minutia and details (= there are more easy going officers than him) so that was helpful to know as I interacted with him on the phone this morning. Hopefully he processes it soon...! 

So all is well. Suzie and Brendan's wedding was marvellous, had a wonderful time and importantly; baby did not come and steal their thunder. Going to organise all the baby stuff we have received, finish packing the hospital bag (4 days to go) and finally, look for some GU10, IP44, LED adjustable kitchen spotlights! :) 

PS. The timing for the kitchen job has been so perfect. While I wanted it to be in April/May, the fact that I am at the Manners on maternity leave has been such a gift because it's great to live in a house full of people coming and going while Ben is still at work. My fears of being bored or lonely on mat leave were not necessary. Very thankful for being here. 

Thursday, 20 July 2017

Flying meter

It's worth calling someone 10 times in a 25 minute period. I was trying to get through the Scottish Power who are due to move our electric meter today (hooray!) - meant to call a guy between 8-8:30am to get our job time but he didn't answer (and usually does). Turns out he is off sick but because his phone kept ringing (woops!) his colleague answered and she will call back with the information.

In the end, still don't have planning permission fully - BUT, our guy at the council finally took my call and knows about the job. He was a bit grumpy and made no promises time-wise; but at least its on his radar. Our contractor is going ahead anyway and has all the evidence and photos of the job when we are inspected by the council.

Anyway. Remember I said the meter needed to be moved before the wall could be knocked down? I was wrong! The builders managed to knock the wall down and leave the meter suspended by its cables! Brilliant! So all the structural work is finished.


And in the time it's taken to write this; I got the call back about the meter timing (around 11am today) so I will let them in to move it. Electric works and plumbing is now also finished. So once the meter is moved, plastering starts (a few walls are needing re-done) and then the kitchen will be ordered and fitted.... We don't have an end date per say, but things are moving along well. 

On a non-kitchen related note; we had a lovely holiday in Alnwick, and Ben and I just booked trains to go down to my sister's wedding in Suffolk this weekend. Baby; please stay put till we get back, then you can come whenever you like. I am so used to being pregnant that it'll be weird not to have a big belly! Now I will attempt to cut and paint my toenails (still possible, but only just!).

Thanks for following :) 


View from living room window (carpet is up)


3 steel beams in; structural work complete! (Note the scabby wall that needs re-done!)

Friday, 7 July 2017

False alarm

Turns out the builders at the site would rather be safe than sorry, so they reported the issue to Max (our contractor), he went and checked it out and its fine, so they are knocking wall 2 down today! Hooray! Also, Brian from the council appears to be back at his desk after sick leave, left him a voice message so hopefully permission will come through soon enough.

I can make plans, but God certainly knows what He is up to. I think it was necessary for me to phone Scottish Power every day for like 2 weeks to get things moving, but now the dates for both the assessment (13th July) and the movement of the meter (20th July) seem to fit really well with the job. Which means the job is running a bit behind schedule, but we are happy to have a baby and come back to the Manners if thats how it pans out.

OK, an hour and 15 mins, I go and wake Ben up (from his post-night shift slumber), we pack and drive off to Alnwick for a weeks holiday. Hooray!

Thursday, 6 July 2017

Kitchen pause

Our builder called earlier this week to say there were structural issues with the flat below not reflected in the drawings. I will try to contact him again in the morning and see what's happened; but my understanding is that they stopped the work. It's kind of frustrating but again, because there is very very little I can do about it, I'm not massively distressed.

Getting used to the idea of having the baby and coming back to the Manners :). It's been lovely here so far.

We are off to Alnwick on holiday for a week tomorrow which I am very much looking forward to (It was meant to be Eyemouth but our Airbnb fell through so we got this place instead). I love the coast.

Monday, 3 July 2017

Kitchen - one wall down, two to go


It's all about contrast isn't it?
Unfortunately in one photo you can't see the lights or the roof  (but there is Jenny, up for a visit with Amy!) and in the other you can, but rest assured it IS the same room. Door on the left of the 'before' photo has gone and we are making the kitchen open plan with the living room. What you can't see in the building picture is that the door on the right is still there. Hopefully permission should come through this week (although structural permission already in place). And actually, I am starting to admit that given the work that needs done (2 more beams to put in and walls to knock down), the electric meter check on the 13th and then move on the 20th isn't as ridiculously late as I previously thought (a cancellation would still be good though!). Work will not be done by the end of July (unless a miracle happens) but a week or two into August should be fine. Chances are higher and higher that the baby will be born while we are at the Manners, but we are very ok with that as a situation - it's the best place to bring our baby back to (unless our flat is finished, cleaned and unpacked!).